Knowledge of installations plus design and constructive flexibility enable ATUs to be supplied directly on site (Malpensa 2000 – 80 ATUs of 72,500 m3/hr), ATUs complete with adjustment and control system and also electrical installations with an inverter (Marco Polo (Venice) – 22 ATUs). |
|
![]()
![]()
![]()
NEW AIRPORT – MALPENSA, MILAN, ITALY |
|
![]()
 |
![]() |
80 air treatment units – 6 million m3/hr
80 air treatment units of 72,000 m3/hr each installed with a double conduit with double fans for an overall 6 million m3/hr of treated air.
All the machines were assembled on site. |
|
![]()
![]()
NEW AIRPORT – MARCO POLO, VENICE, ITALY |
|
![]()
 |
![]() |
22 air treatment units – 750,000 m3/hr
22 air treatment units in a PACKAGE installation, for an overall 750,000 m3/hr complete with adjustment, installations and electrical switchboards with inverters as well as hot and cold water connections and the relative valve units pre-assembled in the workshop. |
|
![]()
![]()
NEW AIRPORT – ‘NATS’ GLASGOW, SCOTLAND |
|
![]()
 |
![]() |
17 air treatment units - 750,000 m3/hr
The 4 units of 120,600 m3/hr and 4 units of 45,970 m3/hr for the computer rooms were tested in the factory in accordance with EN 1886/98 regulations regarding:
- The mechanical resistance of the cover: EN 1886 Class 2
- Cover blow-by pressure: EN 1886 Class B
- Noise reduction panels: ISO 140/III, UNI 8270/3, ISO 717/1, UNI 8270/7
- Vibration: ISO 2372 and VDI 2056
- Air flow: DIN 24-166
- Noise: EN 3744 ISO 11546-2
|
|
![]()
|
|
 |
 |
 |
|
|
|
 |